Deck log: May 18-June 6, 2014

Deck log: May 18-19, 2014

Deck log: May 18-19, 2014
Click on images to enlarge

May 18-Sunny-Wind N-NW 2 cool in AM
0820    colors/ check Bilge Pumps
work continues to prepare for Sea Trial    KF
11:00 New London Fire Dept. on Board for safety
tour.

1300    working on main rig & sails lots of tightening
got msail & topsail bent On

1740    Work Day over Watch Set    Capt. Kip Files

May 19
ALL SECURE ALONGSIDE CITY PIER IN NEW
LONDON. 0800 DAY COMES IN FAIR AND
COOL W/CLEAR SKYS & LIGHT WINDS.
BILGE CHECK COMPLETE, COLORS UP, CREW
BENDING SAIL. SHIPYARD WORKERS LOADING
BALAST.    SJS

1300    WORK CONTINUING, AS BEFORE. NNE WIND
GUSTING F 5-6    SJS
1800    CONDUCTED SHIP FAMILIARIZATION
TRAINING W/CREW
BALESTING CONCLUDED FOR DAY, 50,000 LBS
OF STEEL LOADED MID SHIPS & AFT.
DRAFT 11’6” FWD 13’4” AFT
STRB WATCH STAND DOWN, PORT WATCH
& CHIEF MATE ON DUTY    C/M SS

Deck log: May 20-23, 2014

Deck log: May 20-23, 2014

20 MAY 2014
ALL SECURE ALONGSIDE CITY PIER IN NEW LONDON
0700    ALL HANDS MUSTER, CONTNUE RIGGING WORK
CONTINUE LOADING BALLAST. DAY IN FAIR W
LIGHT NW BREEZE.
1330    FINISH LOADING BALLAST. LOADED ADDITIONAL
27 TONS OF STEEL. RIG WORK CONTINUES AS
BEFORE. DRAFT 12’0” FWD 13’5” AFT
1800    TURN DOWN PORT WATCH    C/M SS

MAY 21 ??? winds N 10 Knots
0700    crew working in rig preparing vessel
for in??
0820    colors – check all ___ ___
1000    BEGIN INCLINE EXPERIMENT, WX RAIN 10-15
RTS SE    SJS
1500    INCLINE CONCLUDED, RECIEVE COI FOR DOCKSIDE
ATTRACTION VESSEL.

1700    MUSTER WALK THRU fire Safety    KF

MAY 22    0800 Color check all gear??
continue to get vessel ready for sea Trials
work on Rig & Sails
Ptly cldy 62 F    Capt. Kip Files

Deck log: May 23-25, 2014

Deck log: May 23-25, 2014

MAY 23
0800    colors check all gear/fire pens & bildge
tested worked on listen perup foul leaks
crew busy with rig & sail
carpenters busy with last min items
May23 con’t
new gangway installed
Ptly Cldy N Winds 10 Knots

May 24
0800    colors check all gear
open to public for tour star watch
on duty
Ptly sunny N winds temp 65+
1700    Secure from tours
1830    start watch stand down deck ____
set
Capt. Kip Files

May 25
0800    colors check all gear
open for VIP tour.
0900    open to public Sunn temp 60
1030    Sea ____ ___outside
1530    close vessel severe thunderstrom
predicted
1540    All guests off vessel.
1546    Double up Ddeckline Flags in
Thunder heard.

Deck log: May 26-29, 2014

Deck log: May 26-29, 2014

MAY 26
0730    ALL HANDS MUSTER, TURN TO RIG WORK
SET UP RUNNING GEAR FOR FORTE & MAIN
TOPSILS & FOR CES’L
1700    FIRE DRILL, FIRE IN HOLD
1715    ABANDON SHIP DRILL
1725    MAN OVER BOARD DRILL
1730    CONDUCTED RED RESCUE BOAT TRAINING
1800    END WORK DAY, PORT WATCH STAND DOWN
C/M SS

MAY 27
0730    ALL HANDS MUSTER, TURN TO RIG WORK
0830    SET MAIN TOPSILS, 0850 TAKE IN
0900    OPEN FOR SCHOOL TOURS
1300    CLOSED TO SCHOOL TOURS
1345    SET TOPSILS & FORES’L, CONDUCTED
BRACING DRILL
1410    TAKE IN AND STOW ALL SAIL
1700    END WORK DAY STRB. WATCH STAND DOWN
C/M SS

MAY 28
0730    ALL HANDS MUSTER, TURN TO RIG
BEND SPANNER. FORE TOPMAT STARSIL?
& JIB
SCHOOL TOURS FROM 0900-1300
1800    END WORK DAY, PORT WATCH STAND DOWN
C/M SS

MAY 29
0730    ALL HANDS MUSTER, TURN TO RIG WORK
0900-1300 SCHOOL TOURS
1500    ALL HANDS TRAINING, SRT TOPSILS,
FORES’L, JIB, FORE TOPMST STAYSIL & SPANNER
1410    FIRE DRILL, FIRE IN HEADS
1418    ABONDON SHIP DRILL
1730    TAKE IN AND STOW ALL SAIL
1830    END WORK DAY, STARBOARD WATCH STAND DOWN
C/M SS

Deck log: May 30-June 1, 2014

Deck log: May 30-June 1, 2014

MAY 30
0730    ALL HANDS MUSTER, TURN TO
RIG WORK – TGALLENTS & MAIN ROYAL
0900    SHIP OPEN FOR SCHOOL TOURS
1300    SHIP CLOSED FOR TOURS
1430    RIG WORK CONCLUDED, TURN TO CLEANING
AND ORGANIZING BELOW DECK.
1730    END WORK DAY. STRB. WATCH & 2/M
ON FOR NIGHT WATCH, PORT WATCH STAND DOWN
C/M SS

MAY 31
0715    STRB WATCH & 2ND MATE MUSTER TO
PREPARE SHIP FOR TOURS
0800    SHIP OPEN FOR TOURS
1700    SHIP CLOSED FOR TOURS
RH 1730 PORT WATCH AND 3RD MATE ON FOR
NIGHT, STBD WATCH & 2ND MATE
STAND DOWN
1800    OPEN FOR RECEPTION OF (RH) MYSTIC SEAPORT
MUSEUM DONORS
1930    RECEPTION ENDS, SHIP CLOSED
Rhadler, 3rd MATE

JUN 01
0715    PORT WATCH & 3RD MATE MUSTER TO
PREPARE VESSEL FOR TOURS
0800    SHIP OPEN FOR TOURS
1700    SHIP CLOSED FOR TOURS
(June 1 cont.)
1745    STBD WATCH AND SECOND MATE ON FOR NIGHT
PORT WATCH/3RD MATE STAND DOWN
1800    OPEN FOR OFF SOUNDINGrS/CRUISING CLUB of AMERICA
RECEPTION
1930    RECEPTION ENDS, SHIP CLOSED, SECURITY CK. CONDUCTED
Sean S. Bercaw, 2nd Mate

Deck log: June 2-3, 2014

Deck log: June 2-3, 2014

June 2
0700    work day commences & shipyard
work continues
0800    colors
1300    ALL HANDS MUSTER; TURN TO
FOR RIG WORK – FORE T’GALLANT & Mainsail
1700    SAILING DECKHAND TRAINING COMMENCES
DISCUSSION OF SECURITY, MAN OVERBOARD,
FIRE, AND ABANDON SHIP EMERGENCIES
1830    RIG WORK ENDS; SAIL TRAINING CONTINUES
SET ALL SAILS, BRACE AROUND, STRIKE
AND FURL
2100    SAIL TRAINING ENDS; PORT WATCH & 3RD MATE
ON FOR NIGH, STBD WATCH STAND DOWN
R. Hadler, 3rd MATE

JUN 3
0700    WORK DAY
COMMENCES; SHIPYARD WORK CONTINUES
0800    COLORS
1300    ALL HANDS MUSTER; LOAD 3 tons of
Ballast astride MIZZEN MAST Step
DRAFT: 12’2” FWD ; 13’6” AFT
Replace FORE StAY
1700    SAILING DECKHAND TRAINING COMMENCES
FIRE DRILLS, ABANDON SHIP DRILLS AND
MAN OVERBOARD DRILLS CONDUCTED
1845    DRILL COMPLETED; UP & OVERS CONDUCTED
2000    SAIL TRAINING ENDS; STBD WATCH & 2ND MATE
2100    SECURITY CK. CONDUCTED; ALL SECURE
Sean Bercaw, 2nd Mate

Deck log: June 4-, 5

Deck log: June 4-5, 2014

June 4
0730    Work day commences; shipyard
work continues; Sbd Watch on.
0800    Colors
1000    All Hands Muster; turn to
for rig work: Tune the fore stay,
fore topmast stay, main topmaswt
stay, main t’gallant stay,
mizzen stay, crowjack yard lifts
June 4 (cont)
1700    Rig Work Ends
1800    Port watch & 3rd Mate take the
watch, stbd watch stands down
Open ship for National ******
Maritime Historicial Society reception
1930    Reception ends; ship closed.
Security check conducted, all secure
R Hadler, 3rd Mate

JUNE 5th – Thursday
0730 – Ship’s WORK DAY COMMENCES; PORT
Watch has the Deck; SHIPYARD PROJECTS
0800 –    Colors
1000 – ALL HANDS Master – Stow the Hold
AND BLUBBER ROOM – Pouring Rain
1300 – SAILING Deckhand TRAINING COMMENCES
CONDUCT MOB DRILL
FIRE DRILL
ABANDON SHIP DRILL
1545 – TRAINING CONCLUDEDS; Ship’s WORK CONTINUES
1740 – Ship’s Work CONCLUDES
1800 – Stbd. WATCH AND 2ND MATE take the Deck
Open Ship for Reception
1930 – Reception Ends; Ship Closed
Security check conducted; ALL SECURE.
2018 – COLORS
Sean S. Bercaw, 2nd Mate

Deck log: June 6-7, 2014

Deck log: June 6-7, 2014

June 6 – Friday
0730    All hands turn to for ship’s work;
shipyard work continues
0800    Colors
0959    Woman jumps off City Pier into New
London Harbor. Crew responds by tossing
life ring into water. “Bonecrusher” RIB is
launched and retrieves woman. Local
authorities (police) called. Three New
London Police Units respond and woman
is turned over to their care. USCG
is notified of incident via VHF 22A.
1730    Work day ends
1800    Port watch and 3rd Mate take the deck; Stbd watch off.
2030    Security Sweep conducted; All secure
R. Hadler, 3rd Mate